Infrastructure Qualification Procedure – Quality IT

Standard Operating Procedure (SOP) for IT Infrastructure Qualification of Computer System used in cGxP environment at the pharmaceutical company. Computer System - IT Infrastructure Qualification 1.0   Objective  This Procedure defines…

Continue Reading Infrastructure Qualification Procedure – Quality IT

Programmable Logic Controller (PLC) Qualification

Protocol and Procedure for Installation Qualification of Programmable Logic Controller (PLC) connected with Manufacturing Equipment. Installation Qualification of Programmable Logic Controller (PLC) 1.0   Objective : The objective of this protocol…

Continue Reading Programmable Logic Controller (PLC) Qualification

Calibration of Glassware (Laboratory)- Procedure

Standard Operating Procedure (SOP) and Protocol for Calibration of Laboratory Glassware (Class A)  like- Volumetric flask, Pipette calibration, Burette calibration used in Quality Control Laboratory for analysis purpose. Glassware Calibration…

Continue Reading Calibration of Glassware (Laboratory)- Procedure