Standard Operation Procedure and Formats of ETP Effluent Treatment Plant & Sewage Treatment Plant (STP) are defined below.
For SOP, please click. SOP for Effluent Treatment Plant (ETP) and STP
Annexure and Formats of ETP and STP
1.0 Daily ETP Performance & Operation Record (ETP Formats / Annexure 1)
Date: _______________ Department: __________
| Sr. No. | Details | Quantity | Unit |
| 1) | Total Qty. of Effluent Treated | KL. | |
| 2) | Total Quantity of Effluent Received | KL. | |
| 3) | Total Power Consumption | Kwh. | |
| 4) | Chemical Consumption Details | ||
| a) | Lime | Kg. | |
| b) | Alum | Kg. | |
| c) | Polyelectrolyte ( For Effluent Treatment) | Kg. | |
| d) | Polyelectrolyte ( For Sludge Treatment) | Kg. | |
| e) | Urea | Kg. | |
| f) | DAP | Kg. | |
| g) | Molasses / Jaggery | Kg. | |
| h) | Sodium Hypochlorite | Kg. | |
| 5) | ETP Running hours in total | Hrs. | |
| 6) | Filter Press running hours in total | Hrs. | |
| 7) | Hazardous Waste Qty. recived / generation | ||
| a) | Process Waste | Kg. | |
| b) | Biological Waste | Kg. | |
| c) | ETP Sludge | Kg. | |
| d) | Other | ||
-
a) Total Chemical Consumption Details:-
| List of the Chemical |
Shift |
Total |
Cumulative |
||
| A | B | C | |||
| Lime in Kg. | |||||
| Alum in Kg. | |||||
| Polyelectrolyte in Kg (Effluent Treatment) | |||||
| Polyelectrolyte in Kg (Sludge Treatment) | |||||
| Urea | |||||
| DAP | |||||
| Molasses / Jaggery in Kg | |||||
| Sodium Hypochlorite in Kg | |||||
| Other chemicals in Kg | |||||
b) pH Monitoring Records
| Sample Name |
pH Monitoring time schedule (with 2 hrs frequency) |
|||||||||||
|
|
||||||||||||
| Inlet | ||||||||||||
| Outlet | ||||||||||||
c) Air Blower Operation Record:-
| Shift | AR – 01 A | AR – 01 B | Remarks |
| A | |||
| B | |||
| C |
d) Flow Meter Reading in KL / M3
Note- FMR – Final Meter Reading, IMR – Initial Meter Reading Diff. – Difference of both
| Name / Details | A Shift | B Shift | C Shift | ||||||
| FMR | IMR | Diff. | FMR | IMR | Diff. | FMR | IMR | Diff. | |
|
Inlet |
|||||||||
|
Outlet |
|||||||||
| Running hours | |||||||||
Remarks: –
e) Filter Back Wash Details: Put a (√), Mark, if backwash did & fill the below-required column.
| A Shift | B Shift | C Shift |
| PSF – Pressure Sand Filter
Done ( ) Not Done ( ) |
PSF – Pressure Sand Filter
Done ( ) Not Done ( ) |
PSF – Pressure Sand Filter
Done ( ) Not Done ( ) |
| ACF – Activated Carbon Filter
Done ( ) Not Done ( ) |
ACF – Activated Carbon Filter
Done ( ) Not Done ( ) |
ACF – Activated Carbon Filter
Done ( ) Not Done ( ) |
Remarks:
f) Filter Press Operation Record :
|
Shift: A |
B |
C |
| Start Time:-
Stop Time:- Total Running Hrs.:- Polyelectrolyte used:- Aeration Time:- Sludge found in Kg.:- |
Start Time:-
Stop Time:- Total Running Hrs.:- Polyelectrolyte used:- Aeration Time:- Sludge found in Kg.:- |
Start Time:-
Stop Time:- Total Running Hrs.:- Polyelectrolyte used:- Aeration Time:- Sludge found in Kg.:- |
| Remarks if Any: |
g) Power Consumption Record
| A Shift – Total in Kwh | B Shift – Total in Kwh | C Shift – Total in Kwh |
h) Shift Manpower Record
| A Shift – Sign. of the Operator / Technician | B Shift – Sign. of the Operator / Technician | C Shift – Sign. of the Operator / Technician |
2.0 Daily STP Performance & Operation Record (ETP Formats/Annexure 2)
Date: _______________ Department: __________
|
Sr. No. |
Details | Quantity |
Unit |
| 1) | Total Qty. of Effluent Treated | KL. | |
| 2) | Total Power Consumption | Kwh | |
| 3) | Chemical Consumption Details | ||
| a) | Alum | Kg. | |
| b) | Caustic Soda | Kg. | |
| c) | Polyelectrolyte ( For Effluent Treatment) | Kg. | |
| d) | Urea | Kg. | |
| e) | DAP | Kg. | |
| f) | Molasses / Jaggery | Kg. | |
| g) | Sodium Hypochlorite | Kg. | |
| h) | Other Chemical | Kg. | |
| 4) | Total STP Running hours | Hrs. | |
| 5) | STP Sludge Generation | Kg. | |
6 a) Total Chemical Consumption Details:-
| List of the Chemical |
Shift |
Total | Cumulative | ||
| A | B |
C |
|||
| Alum in Kg. | |||||
| Caustic Soda in Kg. | |||||
| Polyelectrolyte in Kg (Effluent Treatment) | |||||
| Urea | |||||
| DAP | |||||
| Molasses / Jaggery in Kg | |||||
| Sodium Hypochlorite in Kg | |||||
| Other chemicals in Kg | |||||
Remarks :
b) pH Monitoring Records
| Sample Name |
pH Monitoring time schedule (Frequency: 2hrs) |
|||||||||||
| Inlet | ||||||||||||
| Outlet | ||||||||||||
Remarks :
c) Air blower / Compressed Air consumption record:
| Shift | Total hour consumption details |
| A | |
| B | |
| C |
d) Flow Meter Reading in KL / M3
Note FMR – Final Meter Reading, IMR – Initial Meter Reading Diff. – Difference of both
|
Name / Details |
A Shift | B Shift | C Shift | ||||||
| FMR | IMR | Diff. | FMR | IMR | Diff. | FMR | IMR |
Diff. |
|
|
FM – 01 |
|||||||||
|
FM – 02 |
|||||||||
| Total | |||||||||
| Running hours | |||||||||
Remarks :
e) Power Consumption Record
|
A Shift – Total in Kwh |
B Shift – Total in Kwh |
C Shift – Total in Kwh |
f) Shift Manpower Record
| A Shift – Sign. of the
Operator / Technician |
B Shift – Sign. of the
Operator / Technician |
C Shift – Sign. of the
Operator / Technician |
3.0 Monthly ETP Performance Record (ETP Formats/Annexure 3)
Month: _________________ Year: ___________ Department: __________
|
Sr. No. |
Details | Findings / Results |
Unit |
| 1) | Total Qty. of Effluent Treated | KL | |
| 2) | Total Quantity of Effluent Received | KL | |
| 3) | Total Power Consumption in ETP | Kwh. | |
| 4) | Chemical Consumption Details | ||
| a) | Lime | Kg. | |
| b) | Alum | Kg. | |
| c) | Polyelectrolyte ( For Effluent Treatment) | Kg. | |
| d) | Polyelectrolyte ( For Sludge Treatment) | Kg. | |
| e) | Urea | Kg. | |
| f) | DAP | Kg. | |
| g) | Molasses / Jaggery | Kg. | |
| h) | Sodium Hypochlorite | Kg. | |
| 5) | ETP Running hours in total | Hrs. | |
| 6) | Hazardous Waste Qty. received / generation | ||
| a) | Process Waste | Kg. | |
| b) | Biological Waste | Kg. | |
| c) | ETP Sludge | Kg. | |
| d) | Other | ||
4.0 Monthly STP Performance Record (ETP Formats/Annexure 4)
Month: _________________ Year: ___________ Department: __________
|
Sr. No. |
Details | Findings / Results |
Unit |
| 1) | Total Qty. of Effluent Treated in STP | KL. | |
| 2) | Total Power Consumption in STP | Kwh. | |
| 3) | Chemical Consumption Details | ||
| a) | Alum | Kg. | |
| b) | Caustic Soda | Kg. | |
| c) | Polyelectrolyte ( For Effluent Treatment) | Kg. | |
| d) | Urea | Kg. | |
| e) | DAP | Kg. | |
| f) | Molasses / Jaggery | Kg. | |
| g) | Sodium Hypochlorite | Kg. | |
| 5) | STP Running hours in total | Hrs | |
| 6) | Hazardous Waste Qty. received / generation | ||
| a) | STP Sludge | Kg. | |



Pingback: Procedure for Waste Disposal in Pharma - Pharma Beginners